Anaerobic Digester Plant

TEC Ltd recently completed the Civil Engineering design for the Design & Construction of a £5million expansion of an Anaerobic Digester Plant for RKE Energy at their Herriard Park Farm near Basingstoke.

The unit has been constructed to generate electricity from the animal and plant waste produced by the farm. This electricity is then fed back to power the farm buildings, with excess energy being sold to the grid.

The project involved construction of the following key elements:

  • Alterations to Steel Frame Waste Handling unit
  • New Bio-Digester Tanks
  • New Silage Clamps & Lagoons
  • Site Offices
  • Supporting infrastructure including Roads and Drainage